Time Blocking: Work Without DistractionsCorrespondence, calls, meetings, messages – if you don’t control them, you may not have time left for work.
How to implement:
- Define time blocks when there should be no distractions (for example, 10:00-12:00 – work without chats).
- Set aside separate time for meetings and checking email.
Minimum meetings – maximum resultsMeetings are a huge time-waster if they are held without a clear plan.
How to implement:
- Each meeting should have a goal, agenda and time limit.
- If a meeting takes more than 30 minutes, it can be replaced with a clearly written letter sent to employees.
Deadline controlIf the team does not have a clear deadline control system, projects are delayed.
How to implement:
- Use the Agile approach: short sprints (1-2 weeks) with mandatory analysis of the results.
- Visualize tasks on the Kanban board (Trello, Asana, Jira services) - this will clearly show who is working on what.